Shot library lives under Resources in the Project Plan sidebar (not a numbered step). It is your project-wide media drawer: reference plates from Inputs, planner chat uploads, and every shot's current and archived APP stills and rendered clips.
Gallery (step 13) is the director's grid — one tile per shot, detail view, and batch-friendly inspection. Use Shot library when you need history per shot, to swap hero stills from older takes, or to pick a file from anywhere in the project (including the Choose from gallery control on upload surfaces).
What this is for
- See all still takes for a shot (hero + archived) and promote an older still to hero — what Timeline and video generation follow.
- Browse rendered clips per shot on the Videos tab.
- Review environment, location, cast, and chat reference images without opening each planner step.
- Pick a still or clip when another screen offers Choose from gallery (opens the same library in a modal).
Before you start
- A project is selected in the studio header (same mix as the rest of Project Plan).
- For shot rows to appear, you usually need a locked shot scaffold and some generates — empty rows mean nothing was written to disk yet.
- Know the difference: Gallery = curated grid per shot; Shot library = chronological / archival view and references.
Open Shot library
- Open Project Plan.
- Under Resources in the left rail (or the compact strip on small screens), choose Shot library.
- Use Images vs Videos at the top — the URL updates (
/project-plan/shot-libraryor…/videos).
Images tab
- Reference sections at the top list plates from Inputs, environments, locations, cast, and planner chat — click a thumbnail for the lightbox.
- Shot rows list scaffold shots in order. Each row shows the hero still and archived APP takes.
- Click a thumbnail to preview in the lightbox.
- On an archived still, use Set as hero or the top-left green tick (same checkbox as Gallery and Environment chat) so video and Timeline use that frame.
Videos tab
- Switch to Videos — each shot row lists rendered clips when they exist.
- Click a thumbnail to play in the lightbox.
- Failed or missing clips usually mean Generate never finished for that shot — fix on Generate or the shot card, then refresh.
Screenshot — Images
Click the image for the full-page capture. Scroll to zoom and drag to pan.
Screenshot — Videos
Gallery vs Shot library
| Gallery (step 13) | Shot library (Resources) | |
|---|---|---|
| Layout | One tile per shot, director grid | Rows per shot + reference sections |
| Best for | Compare shots, open detail, regenerate | Hero/take history, references, modal pick |
| Batch work | Pair with Generate | Browse and promote heroes |
Habits
- After a regenerate on Generate, check the shot's row here if the hero didn't update — promote the take you want.
- When Inputs references change, refresh mentally — old stills may still show until you regenerate.
- Prefer Gallery for "which shot needs love?"; prefer Shot library for "which take of this shot is hero?"