10. Shot Direction

For each shot — what we see, what happens, and how the camera behaves — before you pick filming style (primary + optional secondary) for the whole video.

In Project Plan this appears as Shot direction (step 10). The sidebar URL may still say prompts — trust the title on screen.

Step 10 adds a generation brief on top of the Shot scaffold list. The two steps are separate on purpose:

Shot scaffold (9)Shot direction (10)
You editStructure: beat, cast, location, camera class, scaffold camera-action tags, vocal performance toggleBrief only: prompt, action, negative, continuity, camera-action notes, regen notes
Blue pillsScaffold camera actions (grey in the collapsed reference)Camera action notes (sky blue in the brief block)
ButtonEditEdit brief (only when a brief exists)

What this step is for

Every shot has a complete direction pack for Generate — what’s on screen, what to avoid, continuity, and directive camera notes — plus your locked world, cast refs, and Filming style.

What you’ll see on each row

  1. Collapsed “Scaffold (Step 9)” — read-only peek at structure (type, cast, beat, scaffold actions). Change structure on Shot scaffold, not here.
  2. Shot direction brief — preview of the long prompt and blue camera-action notes tags (if any).
  3. Edit brief — modal for Step 10 fields only, with a link to Shot scaffold for structure or vocal performance (read-only badge if the shot is already marked).
  4. Regen — regenerate this shot’s brief from the assistant.
  5. Copy — copy the main brief text.

What to do

  1. Open Shot direction after Shot scaffold is locked.
  2. Run Generate all briefs — work runs per act; one act failing doesn’t always stop the others.
  3. Use Generate missing for gaps without wiping finished shots.
  4. Skim in song order; open Edit brief to fix prompt, action, negative, continuity, or camera-action notes (tag input, up to three).
  5. Use Regen on a row when you want a fresh AI pass (may overwrite that shot’s brief).
  6. Read any warnings after a run.
  7. Approve / lock when satisfied — Filming style stays blocked until this step is locked.

Screenshot of Step 10

Click the image for the full-page capture. Scroll to zoom and drag to pan.

Long waits

Writing briefs can take quite a while per act. You can leave the screen — work may continue in the background. Confirm every shot you care about is briefed and the step is locked before big generates.

Good to know

  • Filming style is one shared look on top of every shot — fix wrong action or blocking in Edit brief; fix overall photographic vibe in Filming style.
  • If faces or clothes drift, revisit Inputs — Look lock lines there override vague wording.

Next

Filming style — pick a primary look and optional secondary blend for every shot.