Locations is your approved list of places (or studio stages) where shots may happen — rooftop, hallway, club interior — grounded in the world you’ve already locked so shots don’t invent random geography.
Each row usually has short prose describing the empty space plus a still so shots staged there share light and colour.
What this step is for
A finite set of named places with rules (“night rain”, “handheld corridor”) so Shot scaffold only assigns shots you’ve approved.
What to do
- Open Locations.
- Add one row per place — title plus what matters (time of day, weather, lens feel).
- For each location, generate or upload plate candidates, then tick the plate you want — top-left green checkbox, same control as Environment chat and Gallery.
- Cross-check Acts — each act should lean on locations that support its emotion.
- Drop contradictory leftovers from earlier experiments.
- Approve / lock before scaffold — scaffold draws only from this list.
Screenshot of Step 8
Click the image for the full-page capture. Scroll to zoom and drag to pan.
Good to know
- Fewer, sharper locations read better on screen than dozens of fuzzy ones.
Next
Shot scaffold — build the timed shot list using these places.
