You (with help from the assistant) write one main brief for the setting: era, place, light, weather, what belongs and what doesn’t. That gives Environment chat something solid to react to instead of guessing.
This step opens only after Song read is approved and you’ve picked:
- A story direction
- At least one environment seed
If something’s missing, go back to Song read, finish those picks, lock Song read, then return here.
What this step is for
A single, shootable description of where this video looks like it was filmed — not the whole plot (that comes in Concept and Acts).
What to do
- Open Environment prompt in Project Plan.
- When Song read is ready, press Start in the chat — the assistant drafts from your Song read choices.
- Edit until place, time of day, palette, weather, and hard nos (what never appears) feel right.
- Keep it visual — save story beats for Concept.
- Approve when you’re ready to generate real-world looks in Environment chat.
Screenshot of Step 4
Click the image for the full-page capture. Scroll to zoom and drag to pan.
Good to know
- If Environment chat keeps fighting you, fix this brief first — weak seeds spread everywhere.
- Use the same language as Song read so Concept doesn’t contradict itself later.
Next
Environment chat — explore images and lock the look.