Environment chat is where you see the world: generated options, your own uploads, and back-and-forth until one look feels like home for the whole video. Concept expects that look to be chosen and applied — not only talked about — so save or apply using the controls your screen shows.
What this step is for
Reference imagery everyone agrees on — lighting, palette, materials — so later shots feel like the same film.
What to do
- Open Environment chat.
- Build on Environment prompt — fix contradictions early (rain vs dry sun, indoor vs outdoor logic).
- Generate options or upload references until one plate reads as “this is our world.”
- Tick up to four candidates as world-look refs — same solid green square (top-left on each thumbnail) used everywhere in the app for checkboxes.
- Apply / lock the world look the way the UI describes — Concept stays closed until this is real, not draft-only.
- Approve the step when the creative lead signs off.
Screenshot of Step 5
Click the image for the full-page capture. Scroll to zoom and drag to pan.
Good to know
- Stay aligned with Song read — emotion and palette should agree.
- A few strong references beat dozens of half-fitting ones.
Next
Concept — the treatment written against this locked world.